mass production efficiencies wouldn’t kick in until they’re building hundreds or thousands
Maybe if you are building laptops and dishwashers. These are small building crammed with plumbing and electrical work, making 4 or 5 of them in a dedicated factory will significantly reduce production costs. You can have one guy who is good at flanged stainless pipe, one guy who is a panel building wizard, and so on. The first project will take the normal amount of time, each subsequent one will go much faster because the team already has a process in place.
Source: I worked industrial construction for 6 years, jobs where more than one copy of the same machine was being built always came in under budget because each copy was built quicker than the last.
A baseload power source’s most important quality isn’t constant output, it’s rapidly adaptable output.
A baseload supply shouldn’t need to throttle up and down, it’s the Base Load. The load that exists 24hrs a day.
Hey, what do you know! There is no labour shortage it’s just that BUSINESS OWNERS DO NOT WANT TO PAY EMPLOYEES. They want to go back to paying slave wages to migrant workers.
Look at the demand and supply graphs for the 6 day period: https://www.ieso.ca/power-data
The lowest demand is about 12K MW, that is the base load, the load never goes below that. Nuclear and hydro cover that 12K MW constantly, and even hydro is throttles up and down to cover the some of the load that varies throughout the day.